Showing posts with label hurricane barriers. Show all posts
Showing posts with label hurricane barriers. Show all posts

Wednesday, September 14, 2016

Almost September and here it is

It has been a busy summer with family and friends, not much time for getting the boat ready for adventures and ventures. Not boating much this summer. It seems to have passed too quickly. Most of the boat is ready for travel. We ordered a replacement battery holder for the stove igniter, ready to install. Put off working on the antenna for the top of the mast and installing a new mast head light until the mast is on the ground end of season.

Just recently we had the remnants of Hurricane Hermine. It was not too bad on our South Coast, the winds were from the N NE.15-25 mph.  We secured Puffin from the winds by adding additional bow, stern and spring lines. Dean went to the boat at our slip many times to make sure we and others were secured for no damage to the boats.
We have made a new list of boat items we want to accomplish this winter while out of water to make the boat comfortable and tech savvy for our Great Loop trip next spring.
We need to have a chart for our expenses while traveling and those at home still being paid. Someone on Sailblogs.com just posted their boat travel expenses for 2016 so far.
These expense charts give a wealth of information generalized for the Great Loop trip.
You can find these charts on various sites including AGLCA site.
Back to the List:
1) Puffin is a ketch sailboat, thus we have 2 masts- you can not have your masts up while traveling on the rivers and canals due to low bridges to pass under. Maximum height for the trip is either 15ft. 6 inches or  19ft depending on your route. We have to decide whether to take the main mast onboard, put up a small back mast for radar, radio, and mast light which can act as one crutch plus an additional crutch forward, or just leave the mast at home and motor the whole trip. I believe carrying both masts and booms, the majority of the trip in crutches above the pilot house will be too much gear overhead, and too much hassle and cost to take down, store on board then put up again in the Great Lakes and then again in the Gulf. Having the masts trucked to the Gulf to await our arrival is another option, but I think,an expensive one.
2) We would like to install 2 solar panels and a wind generator for energy independence on mooring or at anchor and change the lighting to LED.
3) Screens for ventilation in cabin windows and hatches are a must as we will be traveling where there are many insects I don't care to have inside the cabin and a ventilation system for the aft cabin.
4) Mount the dinghy davits so we don't have to drag the dinghy behind-especially handy in locks.
5) To ease the strain of many hours of piloting -an Auto Pilot
6) Inverter to change 12 V to 110, and
7) I-Pad for backup technology for the chart plotter and trip planning.
There are a few more items, but you get the idea- we have from now to spring to prep and be ready to roll - sail/motor to and up the Hudson River in May, 2017. Our boat will be stored in our yard so easy access for repairs and completing our list.


Thursday, August 25, 2016

New Bedford Hurricane Barrier

Tidbit of Information for those who don't know the Hurricane Barrier History
Largest Hurricane Barrier in the World
Started Planning in 1957, Construction in 1962 and Completion in 1966, creating one of the safest harbors for commercial and recreational boats on the East Coast.
High and Wide as the Great Wall of China
The New Bedford Hurricane Protection Barrier lies across New Bedford and Fairhaven Harbor. It is approximately 50 miles south of Boston. The project protects about 1,400 acres in New Bedford, Fairhaven, and Acushnet from tidal flooding associated with hurricanes and coastal storms. This acreage is thickly settled with industrial and commercial properties, particularly along the waterfront and the shores of the Acushnet River. The area represents about 80 percent of land flooded in the September 1938 and August 1954 hurricanes, the latter storm causing $8.3 million in flood damages.
Construction of the New Bedford Hurricane Protection Barrier began in October 1962 and was completed in January 1966, costing $18.6 million. The project required the relocation of power cables, modification of sewerage and drainage facilities, and acquisition of a small boat yard, several buildings, and about 36 acres of land. The city maintains the project, with the exception of the navigation gates and the barrier extending across New Bedford and Fairhaven Harbor which are operated and maintained by the Corps. The project is divided into three principal features: a barrier extending across New Bedford and Fairhaven Harbor with an extension dike on the mainland; Clarks Cove Dike in New Bedford; and Fairhaven Dike. The project has prevented $24.1 million in flood damages and coastal tidal surge since it was built (as of September 2011).
The barrier extending across the harbor consists of a 4,500-foot-long earthfill dike with stone slope protection. The barrier has a maximum elevation of 20 feet and a 150-foot-wide gated opening to accommodate commercial and recreational navigation. It also has two gated conduits that are each nine feet high and six feet wide. The extension dike starts at the western end of the main dike and stretches for 4,600 feet along Rodney French Boulevard East. It has a maximum elevation of 22 feet. The extension dike has three circular gated conduits with diameters of two, three, and four feet, and a street gate on Rodney French Boulevard East. 
Clarks Cove Dike consists of earthfill with stone slope protection. It is 5,800 feet long and extends around the north and east sides of the cove, tying to high ground at both ends. On the north side the dike has a maximum elevation of 22 feet, and on the east side the maximum elevation is 23 feet. The dike also has street gates at Rodney French Boulevard West and Cove Road, and a pumping station.
Fairhaven Dike consists of earthfill with stone slope protection. It starts at high ground near the foot of Lawton Street and runs easterly about 3,100 feet, with a maximum elevation of 20 feet. The dike also has a four-foot-diameter gated conduit.
Courtesy of US Army Corp of Engineers/New England District website