Our boat, Puffin, is finally at our new home South Coast of Massachusetts. We scheduled to have Puffin put on the hard (on land) 2 days later not knowing we would have good weather for the month of November. We also had the masts un-stepped and laid on sawhorses next to the boat. I (Dean), had some work I wanted to do with replacing cables inside the main mast and thought it easier to work on land than on the boat. I needed to reattach the radio antenna cable, at the top of the mast, and pull new cables for the wind indicator and the masthead light.
Winter season passed and a cold early spring. In April we started thinking about doing the cable work so the masts could be put up and our boat launched to a mooring or dock slip. We investigated a mooring in front of our home in New Bedford Harbor area. I went out with the Harbor Master and Mooring person to figure the best place we could drop a mooring. The estimate from the mooring person was between $2500-$3000 to place the mooring.
At the same time Suzan was suggesting that: 1) As we are not going to be in the area summer 2017, to wait until returning to drop a mooring and 2) Would like to be on a dock so we can meet other area boaters and it's easier to do some inside and outside work on the boat requiring electric and/or water.
No comments:
Post a Comment